000 00805cam a2200241 a 4500
001 u123318
003 SIRSI
005 20240619145320.0
008 100104s2010 enka b 001 0 eng
020 _a9780521518512
020 _a0521518512
050 0 0 _aTS157.5
_b.S27 2010
100 1 _aSarin, Subhash Chander
245 1 0 _aStochastic scheduling /
_cSubhash C. Sarin, Balaji Nagarajan, Lingrui Liao.
260 _aCambridge :
_bCambridge University Press,
_c2010.
300 _axii, 191 p. :
_bill. ;
_c27 cm.
650 0 _aProduction scheduling.
700 1 _aNagarajan, Balaji
700 1 _aLiao, Lingrui
907 _a.b10223678
_b29-08-23
_c05-09-18
998 _am
_b29-08-23
_cm
_da
_e-
_feng
_genk
_h0
999 _c13748
_d13748